External Timber Framework:
External walls are factory assembled in varying lengths and with preformed window and door openings as per plan.
Timber used is kiln dried plus treated with preservatives to comply with relative STD.
Panels shall be manufactured with 89x38mm or 140x38mm CLS at 400mm centers as per Engineers Specification.
Panels will be faced with 9mm OSB3 board and board shall be covered with heavy quality breather membrane to Relative STD.
All openings in exterior panels preformed with 220x44mm lintels or to engineers requirements.
All necessary additional cripple studs are preformed with panels.
Internal walls are factory assembled using 89x38mm CLS.
Stud partitions with preformed door openings. Studs will be as per Engineers specifications.
Timber Roof:
With the aid of our engineered Roof software, roof trusses are manufactured and assembled. Wind bracing will be supplied in accordance with I.S./193.
Gable and ladders shall be factory manufactured to be erected on site.
Backing for PVC fascia and soffit shall be fitted.
Storage tank support to be supplied and fitted in roof.
All roofs that are done after block work (eg. 'Bay Window') are not the responsibility of the Timber Frame Company.
Timber Floors:
Floor Panels are fabricated in factory using 225x47 C24 Grade Timber at 400 centers with 18mm OSB3 Board as flooring, subject to design by an engineer.
Room Vents:
All required vents should be provided to conform to building regulations.
Fire Stopping:
All cavity barriers and fire stops shall be supplied.
Roof Battons 50x40mm
Protect A1 felt to comply with relative standards
140mm Acoustic Insulation for External Walls
300mm Fibreglass Insulation for attic
100mm Rockwool for internal walls and between joists in floor area compartment.
12.5mm plasterboard for ceiling and walls
Wall ties (timber frame) & nails
Internal solid red deal doors, door Frames, door Stop, architrave 5" moulded skirting plus furniture fixtures.
Stairs
1. 20% Deposit
2. 2 stage payments – 1st payment for Timber Frame following the delivery to site and 2nd payment to be made in full prior to delivery of full contract.
Or, alternatively, Solicitors letter of undertaking guaranteeing payment immediately from the draw down on loan after the delivery of Timber Frame.
Ramstown, Gorey, Co. Wexford, Ireland
P: 053 9422 099
F: 053 9422 130